| Product Showcase |
Content |
| Product Name |
Fattening Pig Pen
|
| Product Image |
|
| Product Overview |
The Fattening Pig Pen is a modular housing system developed for group management of grower and finishing pigs in commercial pig production facilities. It can be configured for pigs from the post-nursery stage through market weight according to the farm's production program, stocking strategy and local welfare requirements.
The system combines durable pen partitions, access gates, support posts, contact grids and compatible feeding and drinking equipment. Closed and open partition sections can be arranged according to ventilation, animal management and barn layout requirements. The modular construction is suitable for both new steel-structure pig houses and renovation of existing livestock buildings.
|
| Key Features |
- Modular penning system for commercial grower and finisher pig production.
- Flexible pen dimensions and configurations according to barn layout and stocking requirements.
- Available with solid partition panels, ventilated contact grids or combined configurations.
- Durable materials selected for humid and corrosive livestock-house environments.
- Smooth partition surfaces support efficient washing and batch-to-batch sanitation.
- Compatible with dry feeding, wet/dry feeding and liquid feeding systems.
- Compatible with nipple drinkers, drinking cups and centralized water supply systems.
- Practical gate configurations support routine inspection, sorting and animal movement.
- Suitable for slatted-floor and other professionally designed manure-management systems.
- Can be integrated with ventilation, feeding, drinking and manure-removal equipment as a complete pig farm solution.
|
| Structural Components |
- Pen Partitions: Solid PVC or plastic panels, compact board, metal grids or combined partition configurations according to project requirements.
- Support Posts: Galvanized or stainless steel posts designed to provide stable floor anchoring and structural support.
- Contact Grids: Galvanized or stainless steel grid sections can be installed where animal contact and increased air movement are required.
- Access Gates: Small access gates, larger opening gates or full-width gates can be selected according to animal-flow requirements.
- Floor Anchoring: Posts, brackets and fittings are mechanically fixed to the prepared barn floor structure.
- Feeding Equipment: Feeders, troughs, feeding pipes and distribution lines can be integrated into the pen layout.
- Drinking Equipment: Nipple drinkers, cup drinkers and water pipes can be positioned according to stocking density and pen design.
|
| Working Principle / Structural Principle |
The pen system divides the finishing barn into manageable groups while maintaining controlled access to feed, drinking water, resting areas and manure-management zones. Solid partition sections help separate neighboring groups and create defined pen areas, while open contact grids can be used where additional visibility, air movement or animal contact is desired.
Feeders and drinkers are positioned for convenient access and efficient daily management. Where slatted flooring is used, manure passes through the floor into the designed collection system below. Gates and aisle arrangements allow farm personnel to inspect, sort and move pigs efficiently between production sections.
|
| Technical Specifications |
| Application |
Grower pigs, finishing pigs and wean-to-finish projects |
| Pen Type |
Modular group housing pen |
| Pen Dimensions |
Customizable according to project requirements |
| Pen Height |
According to pig size, local regulations and project design |
| Partition Options |
Solid panel, open grid or combined configuration |
| Panel Material |
PVC/plastic panel, compact board or other project-specified materials |
| Metal Components |
Hot-dip galvanized steel or stainless steel options available upon request |
| Gate Configuration |
Small gate, large opening gate or full-width gate |
| Feeding System |
Dry feeding, wet/dry feeding or liquid feeding integration |
| Drinking System |
Nipple drinker, drinking cup or project-specific water system |
| Floor Compatibility |
Concrete slatted floor, partial slatted floor or project-specific flooring |
| Installation Method |
Floor-anchored posts, brackets and modular fittings |
| Barn Compatibility |
Steel-structure pig houses, prefabricated livestock buildings and existing pig barn renovations |
|
| Applications |
- Commercial pig finishing barns
- Grower and finisher production units
- Wean-to-finish pig housing projects
- Large-scale integrated pig farms
- New steel-structure pig house construction
- Existing pig barn renovation and capacity expansion
- Turnkey livestock equipment projects
- Pig farm projects for agricultural contractors, distributors and livestock groups
|
| Customization Options |
The Fattening Pig Pen can be engineered according to individual farm conditions and production targets. Customization options may include:
- Pen length, width and height
- Number of pigs per pen
- Solid and ventilated partition combinations
- PVC, compact board and metal-grid configurations
- Gate dimensions and opening direction
- Galvanized or stainless steel components
- Dry, wet/dry or liquid feeding integration
- Water line and drinker arrangement
- Slatted-floor and manure-system coordination
- Aisle width and animal-flow planning
- New-build or renovation installation
- Design according to local climate, farm conditions and applicable livestock regulations
|
| Installation & Maintenance |
Installation:
- Confirm the final barn layout, pen dimensions, aisle arrangement and floor structure.
- Mark post positions and anchoring points according to the installation drawing.
- Install support posts and floor brackets.
- Fit solid panels, contact grids and partition components.
- Install and adjust gates, locks and operating hardware.
- Connect feeders, feed lines, water pipes and drinkers where required.
- Check alignment, fasteners, gate movement and all animal-contact surfaces before operation.
Maintenance:
- Wash and disinfect pen surfaces between production batches according to the farm's biosecurity program.
- Regularly inspect anchors, bolts, brackets, hinges and gate locks.
- Check drinkers and water connections for leakage or blockage.
- Inspect feeders and feed outlets to maintain correct operation.
- Replace damaged panels or hardware promptly to maintain animal safety.
- Keep manure channels and slatted-floor areas clean and unobstructed.
|
| Product FAQ |
Q: What production stage is the Fattening Pig Pen designed for? A: It is mainly designed for grower and finishing pigs. The exact pen dimensions and stocking arrangement should be determined according to pig weight, production program and local welfare requirements.
Q: Can the pen dimensions be customized? A: Yes. Pen length, width, height, gate position and partition configuration can be customized according to the pig house layout and project requirements.
Q: What materials are available for the partitions? A: Depending on project requirements, the system can use durable plastic or PVC panels, compact board, galvanized steel grids, stainless steel components or combined configurations.
Q: Can the pen be used with automatic feeding systems? A: Yes. The pen layout can be coordinated with dry feeding, wet/dry feeding or liquid feeding systems. Feeders and feed pipes can be positioned according to the selected feeding concept.
Q: Is the system suitable for large commercial pig farms? A: Yes. Its modular construction is suitable for repeated pen layouts in large finishing barns and can also be adapted for smaller farms or renovation projects.
Q: Can SHEWUYOU provide a complete pig house equipment solution? A: Equipment configurations can be developed according to project requirements, including penning, feeding, drinking, flooring coordination, ventilation interfaces and other livestock-house equipment.
Q: What information is required for a quotation? A: Please provide the pig house dimensions, production stage, expected number of pigs, preferred pen layout, feeding method, flooring system and project location. Drawings or preliminary farm plans are helpful for preparing a suitable configuration.
|
| Product Gallery |
|
Comments & Inquiries
Leave your questions or requirements below. We will reply as soon as possible.