| Product Name | Large Scale Livestock Evaporative Cooling System |
| Product Image | |
| Product Overview |
The Large Scale Livestock Evaporative Cooling System combines cooling pad sections, water circulation and planned ventilation to treat incoming air across a livestock building. Warm outdoor air passes through wetted pads, where evaporation absorbs heat before the air enters the animal space. For commercial pig farms and poultry houses, the pad wall is designed together with exhaust fans, air inlets and controls. Their placement and capacity determine how air travels through the building and how moisture is removed. The system can be planned for new pig farm construction or a suitable ventilation upgrade. Modular pad sections allow the intake area and supporting frame to follow the wall openings and building layout, including those of a steel structure building. For livestock groups, engineering companies, distributors and agricultural project buyers, the final design depends on animal type, stocking plan, local climate, water quality and the required ventilation rate. Cooling performance must be assessed for the project rather than assumed from a fixed temperature-reduction figure. |
| Key Features | 1. Uses water evaporation to cool fresh air entering the livestock building. 2. Combines modular pad sections into an intake area sized for the project. 3. Works with exhaust fans as part of a livestock ventilation system. 4. Supports planned airflow through large pig and poultry houses. 5. Allows the frame and pad arrangement to suit building openings. 6. Recirculates unevaporated water where specified in the system design. 7. Permits access to pads, gutters and water components for maintenance. 8. Can be coordinated with farm environmental controls. 9. Supports new agricultural projects and suitable existing-building upgrades. |
| Structural Components | 1. Evaporative cooling pads: Provide the wetted surface through which incoming air passes. 2. Pad frames and retainers: Support the media within the intake openings. 3. Water distribution line: Spreads water across the top of the pad sections. 4. Collection gutter or reservoir: Captures unevaporated water where the design uses recirculation. 5. Pump and water piping: Move water through the cooling circuit. 6. Make-up water and drain connections: Support operation and cleaning. 7. Exhaust fans and air-control equipment: Establish the planned airflow through the building. 8. Controls and sensors: Operate cooling and ventilation according to the selected configuration. |
| Working Principle / Structural Principle |
The pump supplies water to the distribution line above the cooling pads. Water flows over the media, while any unevaporated water is collected according to the specified water-circuit design. Exhaust fans draw warm outdoor air through the wetted pads. As part of the water evaporates, it absorbs heat from the passing air. The treated air then travels through the livestock house toward the exhaust points. Evaporation also adds moisture to the incoming air. The available cooling effect depends on outdoor temperature and relative humidity, while suitable fan capacity and air distribution remain essential throughout the building. |
| Technical Specifications | System airflow: According to project requirements Pad wall length and height: Customizable Pad type and thickness: Available upon request Frame material and layout: According to building and project requirements Water circulation and pump configuration: Available upon request Exhaust fan quantity and capacity: According to ventilation design Controls and sensors: Available upon request Electrical supply: According to destination-market requirements Expected cooling performance: Designed according to local climate and farm conditions |
| Applications | 1. Large commercial grower and finisher pig houses 2. Sow and breeding facilities 3. Broiler houses 4. Layer and breeder poultry buildings 5. Livestock barns with designed mechanical ventilation 6. Multi-building livestock farm projects 7. Steel structure agricultural buildings 8. New pig farm construction 9. Existing farm ventilation upgrades |
| Customization Options | 1. Cooling pad area for the required intake airflow. 2. Pad wall location and arrangement for the building layout. 3. Frame and fixing details for the available structure. 4. Water supply, filtration, circulation and drainage arrangement. 5. Exhaust fan selection and placement. 6. Control coordination with other livestock equipment. 7. Service access and weather protection for the intake area. |
| Installation & Maintenance |
Project planning: Confirm building drawings, animal numbers, local climate data, ventilation targets, water quality and electrical supply. Coordinate the pad wall with exhaust fan positions and the intended airflow path. For a steel structure building, verify opening details, support loads, weather protection and maintenance access with the project engineer. Installation and commissioning: Mount the frames, fit the pad sections and connect the water distribution, collection and drainage components. Test even wetting across the pad surface, check for leaks and confirm that fan operation draws air through the intended intake area. Routine maintenance: Inspect pads for blockage, damage or uneven wetting. Clean the water circuit, pump inlet, gutter and drain as required by site conditions. Monitor scale and algae, manage water replacement according to water quality, and follow the selected media and equipment manuals when cleaning or replacing components. |
| Project Cases |
Illustrative commercial pig farm: A new pig house is planned with modular pad sections at the fresh-air intake and exhaust fans at the opposite end. The engineering team sizes both sides of the ventilation system to the building and stocking plan. Illustrative poultry project: Several poultry houses share a project specification but receive individual pad wall lengths and fan selections according to each building's dimensions and ventilation needs. These examples describe possible system layouts; they are not claims of completed SHEWUYOU installations. Gallery images show representative configurations. |
| Product FAQ | 1. What is included in a complete project design? The scope can include cooling pads, frames, water circulation, exhaust equipment and controls, according to project requirements. 2. Can the pad wall operate without exhaust fans? A planned airflow source is necessary. In a negative-pressure livestock house, exhaust fans draw air through the wet pads. 3. How is the required pad area determined? It is selected alongside the ventilation rate, allowable airflow resistance, building layout and chosen pad media. 4. Is this system suitable for humid climates? Evaporative cooling potential is generally lower when outdoor humidity is high. Local climate data should be reviewed before selection. 5. How much will the indoor temperature decrease? The result depends on outdoor conditions and system design. A project-specific assessment is needed before stating a figure. 6. Can the system be fitted to an existing farm? Yes, if the structure, intake openings, water services and ventilation arrangement can support the proposed design. 7. What water quality is required? Water treatment and maintenance should be selected after reviewing the available water for minerals and other contaminants. 8. How are the cooling pads maintained? Inspect for deposits, blockage, damage and uneven water distribution. Clean or replace them according to the selected media manual. 9. What should buyers provide for a quotation? Send building drawings, project location, livestock type, stocking plan, existing ventilation details and water and electrical information. |
| Product Gallery |


Comments & Inquiries
Leave your questions or requirements below. We will reply as soon as possible.