| Product Showcase | Content |
|---|---|
| Product Name | Pig Farm Automatic Manure Removal and Urine Separation System |
| Product Image |
![]() |
| Product Overview | Designed for commercial pig houses, this system removes manure from channels beneath slatted floors while directing urine through a separate drainage route. A scraper conveys the retained solids toward a collection point; the channel profile and urine pipe help limit mixing at the point of collection. The arrangement can be incorporated into new pig farm construction or planned as part of a barn renovation after a site survey. |
| Key Features |
|
| Structural Components | A typical configuration comprises an underfloor manure channel, V-shaped channel base, scraper assembly, traction cable, corner guides, geared drive unit, travel limit devices, electrical control cabinet and separate PVC urine drainage pipe. External manure transfer equipment and the final collection area are specified for the project. |
| Working Principle | Waste falls through the slatted floor into the channel below. Liquid drains toward the lower urine collection route, while the scraper moves retained manure along the channel to its discharge point. The solids may then be transferred through an external channel to storage, treatment equipment or a loading area. Separation performance depends on the channel geometry, drainage condition, bedding use and operating schedule. |
| Technical Specifications |
|
| Applications | Suitable for manure collection beneath slatted-floor areas in gestation, farrowing, nursery and finishing facilities, subject to the barn design. The system can be integrated with concrete manure channels, steel structure pig house projects and downstream manure storage or treatment plans. |
| Customization Options | Scraper dimensions, channel layout, urine drainage, drive placement, control settings and discharge interfaces can be designed according to local climate and farm conditions. Provide pen and channel drawings, building dimensions, floor type and the intended manure destination for project assessment. |
| Installation & Maintenance | Coordinate channel slopes, embedded drainage and equipment clearances during civil works. Install and align the scraper path, guides, traction system, drive and travel limits before commissioning. During operation, inspect cable tension, scraper wear, guides, fasteners and urine pipe flow; remove blockages and service the drive according to the supplied equipment instructions. |
| Product FAQ |
Can the system fit an existing pig house? Does it include downstream manure treatment? What information is needed for a quotation? |
| Product Gallery |
![]() ![]() ![]() |


Comments & Inquiries
Leave your questions or requirements below. We will reply as soon as possible.